I'm new here. Just posted brief intro. Hoping for fast answer.
Deck builder "poured" concrete around 6x6 posts. Stopped several inches below grade. He decided the concrete needed to be above grade to keep soil off posts.
I didn't want 2' circle of concrete above grade so I asked & he agreed I could build forms to make smaller footprint above grade. I let it go back under deck where it would be gravel.
My question: what's the shortest time I can wait before removing forms so I can trowel the sides & top? The form create a 10" x 10" block around a 6x6 post except for 1 double. Range from about 3" tall to 8" tall. I'm on central time & work was done about 4-5pm. Central Alabama, high mid 80's today, mid 60's tonight. DRY no rain expected for a week. Used quikrete # 1011.
2 pics attached. One is first form I built & other is double firm almost finished.
Thanks for any help. I may need to come back out tonight!
Eddie
I'm new here. Just posted brief intro. Hoping for fast answer.
Deck builder "poured" concrete around 6x6 posts. Stopped several inches below grade. He decided the concrete needed to be above grade to keep soil off posts.
I didn't want 2' circle of concrete above grade so I asked & he agreed I could build forms to make smaller footprint above grade. I let it go back under deck where it would be gravel.
My question: what's the shortest time I can wait before removing forms so I can trowel the sides & top? The form create a 10" x 10" block around a 6x6 post except for 1 double. Range from about 3" tall to 8" tall. I'm on central time & work was done about 4-5pm. Central Alabama, high mid 80's today, mid 60's tonight. DRY no rain expected for a week. Used quikrete # 1011.
2 pics attached. One is first form I built & other is double firm almost finished.
Thanks for any help. I may need to come back out tonight!
Eddie