I'm pouring a sidewalk slab along the side of my girlfriend's house in Oregon. It's 25 feet long by 4 feet wide and 5 inches thick, with welded wire mesh in the center. The slab will run between the house foundation and a row of concrete pavers. I've done masonry work for years but haven't dealt with this kind of narrow run before. Should I add joints every 5 feet or can I stretch it to 10 without risking cracks?