I've been in construction for 15 years, and I keep seeing crews pour these long sidewalks in one continuous slab, and they always end up with a ton of cracks, even with the control joints.
I have this memory from my old country, where they would pour sidewalks in a checkerboard pattern.
They would do sections 1, 3, 5, and then come back later and pour sections 2, 4, 6, creating cold joints.
I haven't seen a single example of this since. Has anyone else ever seen this done?
I'm curious, is the checkerboard method more expensive or time consuming than a continuous pour?
I have this memory from my old country, where they would pour sidewalks in a checkerboard pattern.
They would do sections 1, 3, 5, and then come back later and pour sections 2, 4, 6, creating cold joints.
I haven't seen a single example of this since. Has anyone else ever seen this done?
I'm curious, is the checkerboard method more expensive or time consuming than a continuous pour?