TheClock
Active member
My dad is usually the one who’s in charge of this, but he’s out of the state for a few weeks. Now, I gotta dump 3.5 yards of concrete into these 12 and 16”sonotubes, right? I've been spoiled rotten and never even thought about doing this any other way, so now I'm wondering how you guys usually handle this mess
I want to build some kind of trough that's a little wider than my skidder bucket. It would slope down and have an opening right over each tube. That way, I could just dump the concrete in, and the guys could push it with shovels towards the hole, letting gravity do its thing and fill up the tube. Then I could just lift this contraption and move it to the next tube. Sounds like it'll cost more and be a pain in the btt to build than I'd like, but I can't think of an easier way right now.
There's no way I'm doing this one shovel at a time, it would take forever! Need insights here guys, tell me what you all think
I want to build some kind of trough that's a little wider than my skidder bucket. It would slope down and have an opening right over each tube. That way, I could just dump the concrete in, and the guys could push it with shovels towards the hole, letting gravity do its thing and fill up the tube. Then I could just lift this contraption and move it to the next tube. Sounds like it'll cost more and be a pain in the btt to build than I'd like, but I can't think of an easier way right now.
There's no way I'm doing this one shovel at a time, it would take forever! Need insights here guys, tell me what you all think